Bella Vista All Weather Track Project Pictures
![]() |
![]() |
![]() |
![]() |
4 pictures above - Teichert Inc. removing unsuitable soil from "Taft Creek" east side. |
![]() |
![]() |
Left - beginning to lay "petra-mat" down in low, soft area by visitor stands. Right - "petra-mat" down across width of track followed by gravel. |
![]() |
Preparing the most important area, the high jump area north side. |
![]() |
Mount Nishimura grows! |
![]() |
Mixing lime into gravel to stabilize sub-grade. |
![]() |
Mixing lime into gravel to stabilize sub-grade. |