Bella Vista All Weather Track Project Pictures
![]() |
| Rubber/urathane mixing machine. |
![]() |
| Rubber/urathane mixing machine. |
![]() |
| Laying rubber on east pole vault runnway. |
![]() |
| Laying rubber on east pole vault runnway. |
![]() |
| Laying rubber on east pole vault runnway. |
![]() |
| Spraying primer on north track surface. |
![]() |
| Spraying primer on north track surface. |
![]() |
| First rubber paving east side. |
![]() |
| Rubber paving machine. |
![]() |
| Starting to pave south turn. |
![]() |
| Finishing paving south turn. |
![]() |
| High jump apron |
![]() |
| Long/Triple jump runways being surfaced |
![]() |
| Long/Triple jump runways being surfaced |
![]() |
| Finishing up the base rubber under the lights (3-25-02) |