Bella Vista All Weather Track Project Pictures
![]() |
Rubber/urathane mixing machine. |
![]() |
Rubber/urathane mixing machine. |
![]() |
Laying rubber on east pole vault runnway. |
![]() |
Laying rubber on east pole vault runnway. |
![]() |
Laying rubber on east pole vault runnway. |
![]() |
Spraying primer on north track surface. |
![]() |
Spraying primer on north track surface. |
![]() |
First rubber paving east side. |
![]() |
Rubber paving machine. |
![]() |
Starting to pave south turn. |
![]() |
Finishing paving south turn. |
![]() |
High jump apron |
![]() |
Long/Triple jump runways being surfaced |
![]() |
Long/Triple jump runways being surfaced |
![]() |
Finishing up the base rubber under the lights (3-25-02) |