Bella Vista All Weather Track Project Pictures


Rubber/urathane mixing machine.
 
Rubber/urathane mixing machine.
 
Laying rubber on east pole vault runnway.
 
Laying rubber on east pole vault runnway.
 
Laying rubber on east pole vault runnway.
 
Spraying primer on north track surface.
 
Spraying primer on north track surface.
 
First rubber paving east side.
 
Rubber paving machine.
 
Starting to pave south turn.
 
Finishing paving south turn.
 
High jump apron
 
Long/Triple jump runways being surfaced
 
Long/Triple jump runways being surfaced
 
Finishing up the base rubber under the lights (3-25-02)